What: | From: | To: | # sections shelving needed |
---|---|---|---|
General Collection | 3rd floor | 5th Level | not calculated in same way |
Documents collection | 2nd Floor | 1st Floor South: perm. loc |
|
Catalog Dept. collections | 1st Floor | 4th Floor temp loc | 100 df, 10", 14/section |
Serials Dept. collections | 1st Floor | 1st Floor West (perm loc) |
|
Acquisitions & Coll Dev. Depts. collections | 1st Floor and Ground Floor | 4th Floor, temp loc |
|
Holding Room | ??? | 1st Floor West, perm. loc |
|
Reference collection | 1st Floor | 2nd Floor south, temp. loc |
|
Microforms collection | 3rd floor | 1st Floor south, perm. loc |
|
Microfilm Project | Dungeon | Forgot where it moved temporarily |
|
Douglass Listening Room collection | 3rd Floor | 2nd Floor (where Documents was) | 20 df, 12" wide (12 slotted with backs), 90" tall |
Assume that all ranges on the 5th Level are already constructed and spanned.
Back to Shift Planning main page
Page created by sstevens@darkwing.uoregon.edu
Last substantive update: 970506