09/08/2009-Tue (JD251)


Tom Spoto (Chief Gunner), Brian Goodick (Source Mech) and Donald Cucchiara (Source Mech) working near the slip way.

Daily Report from Anthony Johnson
090809_V1_DR_MGL.pdf
Steady progress continues.  Just prior to the noon meeting there was a temporary loss of power.  As this occurred during rough weather with low visibility, the possibility arose that we might miss a shot during the 9 minute window, in which case we would be down until visibility returned.  Power was quickly restored and the Science Techs worked quickly and efficiently to recommence shooting.  This occurred within 4 minutes of the power outage.  As we have come to expect, it was a professionally done effort on the part of the ship’s personnel.