Meeting Schedule- Updated Aug 17, 2010

Note: This is a schedule for all user groups, parties and committees participating in the LISB project. If you see a meeting on this schedule it means that it has already been confirmed by email. UG = User Group.

Date Group Time Location Materials
Th, 8/26 Furniture Committee 2:00-4:00 350 Willamette  
Tu, 8/24 Envi'l Monitoring & Control 2:00-3:30 Novick CR, Streisinger  
Th, 8/19 LEED Workshop 12:00-4:00 350 Willamette  
W, 8/4 Furniture Committee 2:30-4:00 350 Willamette Agenda
Notes, Pictures
Tu, 8/3 50% CD Reviews:
EH&S - Lab & Fire Safety
Plumbing

2:30-4:00
1:00-2:30
EMU Maple  
M, 8/2 50% CD Reviews:
HVAC + Hydronics
Electrical

1:00-4:00
10:30-12:00
EMU Century E  
W, 7/14 CUG 2:00-4:00 350 Willamette Agenda, Notes, Powerpoint
W, 6/9 Awh
Dass./Frey/Sereno

1:00-2:00
9:00-11:00

EMU Owyhee

See 5/28
See 5/26
W, 6/2 Basement 2:00-4:00 Lokey Labs CR Signoff
W, 6/2 Neville
Pfeifer
2:00-3:00
11:30-12:30
EMU Century E


W, 6/2 Mayr/Vogel 10:00-11:30 EMU Century E See 5/28
F, 5/28

Awh/Vogel/Mayr
CUG (Cancelled)

1:00-2:30
10:30-12:00
EMU Owyhee Rm Notes, Signoff

W, 5/26 Neville/Pfeifer
3:00-5:00
EMU Century C
Notes
W, 5/26 Dassonville/Frey/Sereno 10:00-11:30 EMU Century C Notes, Signoff
W, 5/26 Electrophys Labs 10:00-12:00 EMU Century E Signoff
W, 5/26 Imaging Center 9:00-10:00 EMU Century E Signoff
T, 5/25

Basement

3:00-5:00
Lokey Lunchrm
See 6/2 above
T, 5/25 Fly Lab 2:00-3:00 Lokey Labs CR SIgnoff
F, 5/7 CUG 2:30-4:30 350 Willamette Agenda
Notes
Powerpoint
T, 4/27 Campus Planning Committee 2:30-4:00   CPC Record
W, 3/31 DD Reviews:
HVAC
Telecom
Electrical
Plumbing/Piping/Hydronics


1:00-4:00
12:00-1:00
10:00-11:30
8:00-10:00

All reviews are in the
EMU Fir Room
HVAC notes

Elec/Tele notes
Plumbing notes
T, 3/30 DD Review: Landscape/Exterior Team 11:00-12:00 FS Large CR  
F, 3/12 1% for Art 1:00-4:00 Willamette 350 Powerpoint
T, 3/11 CUG 2:00-4:00 Willamette 350 Agenda, Notes
W, 2/24 Lab Plan Signoff 3:30-5:00 Lokey Labs CR  
W, 2/24

Basement Plan Signoff Meeting (Mat/Phy)

1:00-3:30

Lokey Labs CR

 
W, 2/3 Mat/Phy UG (Basement) 9:00-12:00 Lokey Labs CR  
U, 2/2 CUG 2:00-4:00 Willamette 350 Agenda, Powerpoint, Notes
U, 1/20 Office/Conference Areas 10:00-12:00 Willamette 350  
U, 1/12 Mat/Phy UG (Basement) 3:30-5:00 Lokey Labs CR  
W,12/9 Mol Bio Replacement Space 11:30-12:30 EMU Metolius Drawings
W,12/9 Neuro Labs UG 9:30-11:30 EMU Metolius Drawings
U,12/8 Coordinating User Group 2:30-4:30 EMU Alsea Agenda, Notes
Powerpoint
U,12/8 Imaging Center 1:00-2:00 EMU Alsea  
U,12/8 Mat/Phy UG 9:30-11:30 EMU Alsea Drawings
U,11/24 Sustainability 1:00-3:00 EMU Metolius Meeting1notes
Sustain.Goals
11/24 Notes
U,11/17 Coordinating User Group

3:00-4:30

Willamette, 350 Agenda
Notes, PPT
U,11/17 Neville
Pfeifer
1:00-2:00
11:00-12:00
Willamette, 350 Drawings
M,11/16 Awh/Mayr/Vogel Labs 2:30-3:30 EMU Century E  
M,11/16 Dass./Frey/Ser./Uns. Labs 1:30-2:30 EMU Century E  
H,11/5 Imaging Center 2:00-3:30 EMU Century E Drawing
H,11/5 Mat/Phy UG 11:00-1:00 EMU Century E Drawings
H,11/5 Neuro Labs 9:00-11:00 EMU Century E Drawing
W,11/4 Mol Bio Replacement Space 11:30-12:30 EMU Century E Drawing
H,10/22 Dass./Frey/Ser./Uns. Labs 9:00-11:00 Willamette, 350  
W,10/21 Neville/Pfeifer Labs 3:30-5:00 Lewis Center ConfRm, Straub

 

W,10/21 Campus Planning Committee 1:30-3:00 Straub, Rm 143 Powerpoint
Record
W,10/21 3rd Floor Labs 1:00-3:00 Conference Call  
W,10/21 Mol Bio Replacement Space 10:00-12:00 EMU Century B  
W,10/21 Awh/Mayr/Vogel Labs

10:00-12:00

Willamette 240D


W,10/14 Neuro Labs UG 12:00-2:00 EMU Century A  
W,10/14 Mat/Phy UG
10:00-12:00
EMU Century A


W,10/14 Lab Technical Review 8:30-10:00 EMU Century A  
U,10/13 Imaging Center UG 3:00-4:00 Willamette, 240D  
U,10/13

Mol Bio Replacement Space

1:30-3:00 Willamette, 240D
M,10/12 Campus Planning Committee 1:00-2:30 EMU Fir Rm  
F,10/9 Facilities SD Review Follow-Up 9:00-2:30 EMU Metolius Follow-Up Notes
W,10/7 CUG Schematic Design Review 1:00-3:00 Deschutes Colloq Rm

Powerpoint
Record

W, 9/30
T
u, 9/29

Facilities Schematic Design Reviews
8:00-5:00

Willamette, 350
EMU Cent Rm A

SD Review Notes