System Strategy: Vaporization Phase Auditing & Compliance
Duration: December 31, 2025 – April 3, 2026
| Metric | Ground Truth (Totalizer) | Logger Integration |
|---|---|---|
| Start (12/31/25) | 0 SCF | 0 SCF |
| Mid-Point (01/12/26) | 105,935 SCF | 105,274 SCF |
| End (04/03/26) | 923,190 SCF | 931,292 SCF |
| Variance | -0.87% (Logger High) | |
Audit Notes: The 0.87% variance is well within the ±1% factory specification. A slight "over-counting" drift was observed as ambient temperatures rose from 28°F in January to 62°F in March. Data resolution was found to be 4.5 minutes due to an interval setting error in Phase 1.
Usage Trends: Base load remains steady near 386 SCFH during off-hours and weekends. Weekday usage reliably ramps up starting at 6:00 AM, peaking around 1:00 PM (~481 SCFH average), and tapers off near 7:00 PM.