2026 ONYX LN2 Gaseous Delivery Monitoring

System Strategy: Vaporization Phase Auditing & Compliance

Phase 1: Winter/Spring Audit (Completed)

Duration: December 31, 2025 – April 3, 2026

MetricGround Truth (Totalizer)Logger Integration
Start (12/31/25)0 SCF0 SCF
Mid-Point (01/12/26)105,935 SCF105,274 SCF
End (04/03/26)923,190 SCF931,292 SCF
Variance-0.87% (Logger High)

Audit Notes: The 0.87% variance is well within the ±1% factory specification. A slight "over-counting" drift was observed as ambient temperatures rose from 28°F in January to 62°F in March. Data resolution was found to be 4.5 minutes due to an interval setting error in Phase 1.

Phase 1 Usage Analysis

Usage Trends: Base load remains steady near 386 SCFH during off-hours and weekends. Weekday usage reliably ramps up starting at 6:00 AM, peaking around 1:00 PM (~481 SCFH average), and tapers off near 7:00 PM.

Jan 12 Calibration Point
Jan 12 Snapshot

Phase 1 Assets: Raw CSV Data Binary .DAT File Initial Strategy PDF

Phase 2: Spring/Summer Audit (Completed)

Duration: April 3, 2026 – June 30, 2026 (87 days)

MetricPhase 2 Result
StartApril 3, 2026 @ 3:42 PM
EndJune 30, 2026 @ 10:10 AM
Logger Integration (Total SCF)783,071 SCF
Monthly BreakdownApril: 250,687 SCF | May: 279,446 SCF | June: 252,938 SCF
Average Flow Rate372.11 SCFH
Peak Flow Rate812.50 SCFH (June 24, 2026 @ 2:10 PM)
Minimum Flow Rate0.00 SCFH
Std. Deviation63.67 SCFH
Weekday Average385.47 SCFH
Weekend Average340.41 SCFH
Avg. Ambient Temp (Chan 1)60.6°F
Peak Ambient Temp (Chan 1)92.3°F (June 15, 2026 @ 5:02 PM)

Phase 2 Gas Consumption Over Time

Phase 2 Usage Analysis

Usage Trends: Overnight base load averages ~347 SCFH. Weekday demand climbs from 8:00 AM, peaking around 1:00 PM (~418 SCFH average), and tapers off by 7:00 PM. Summer usage is noticeably lower than Phase 1 winter/spring values — weekday average is down 10.5% and peak flow is 23.5% lower, consistent with lower cryogenic demand in warmer months.

Phase 1 vs. Phase 2 Comparison

MetricPhase 1 (Winter/Spring)Phase 2 (Spring/Summer)Change
DurationDec 31 – Apr 3 (93 days)Apr 3 – Jun 30 (87 days)
Peak Flow Rate1,062.50 SCFH812.50 SCFH−23.5%
Weekday Average430.76 SCFH385.47 SCFH−10.5%
Weekend Average386.53 SCFH340.41 SCFH−11.9%
Data Interval4.5 min (error)4 min (corrected)✓ Fixed
Phase 2 Software Settings
Verified 4m Interval

Phase 2 Assets: Raw CSV Data Binary .DAT File Configuration XML Scaling Documentation

✅ Data Retrieved June 30, 2026 — Phase 2 Complete. Logger reset for Phase 3.